Technical Office
Via dei Muratori snc
05018 Orvieto (Tr)
Tel. 0763.316137
Fax 0763.316139
E-mail
segreteria@ceprinicostruzioni.it
tecnico@ceprinicostruzioni.it
info@pec.ceprinicostruzioni.it

PROJECT ENGINEERING AND EXECUTION OF WORKS ON NORTH – SOUTH ROAD AXIS OF BOLOGNA CENTRAL STATION

PROJECT ENGINEERING AND EXECUTION OF WORKS ON NORTH – SOUTH ROAD AXIS OF BOLOGNA CENTRAL STATION

Project Detail

Project engineering and execution of works for the realization of north – south road axis – first functional phase, from Via Bovi Campeggi to Via de’ Carracci, with an undercrossing of the north part of the railways – of Bologna Central station and arrangement of vehicular access to Kiss and Ride floor of the high speed railway station of Bologna (LOT 15). Ordered works by Italferr S.p.A to the Joint Venture: Ceprini Costruzioni S.r.l. (g.l), Costruzioni Edili Baraldini Quirino S.p.a. (l.c). Works delivery on 20/05/2014, the works are still on execution.

Sharing