REALIZATION N. 2 UNDERPASSES FOR LEVEL CROSSING SUPPRESSION ON KM 2+626 OF BOLOGNA – ANCONA / BOLOGNA – FIRENZE RAILWAY LINE.
Client Rete Ferroviaria Italiana Spa
Schedule Construction of replacement works for the suppression of the level crossing located at Km 2+626 of the railway line Bologna – Ancona / Bologna – Firenze, in the township of Bologna.
Project Detail
Construction of replacement works for the suppression of the level crossing located at Km 2+626 of the railway line Bologna – Ancona / Bologna – Firenze, in the township of Bologna. Building owner Rete Ferroviaria Italiana S.p.A. Start of works on 15/9/2003, end of works 20/10/2006.