URGENT CONSOLIDATION KM 288+750 BATTIPAGLIA / REGGIO C. (RC) RAILWAY LINE
Client RETE FERROVIARIA ITALIANA S.p.A.
Schedule Urgent works on the road body and railway constructions to urgently restore railway operations on the even - odd numbered tracks between Km 288+750 and 288+950, interrupted after the collapse of the retaining wall under the slope, as a consequence of the landslide that occurred on 17/12/2008, and definitive consolidation of railway embankment in the above mentioned segment of the Battipaglia - Reggio Calabria line, between Vibo Pizzo and Mileto stations.
Project Detail
Urgent works on the road body and railway constructions to urgently restore railway operations on the even – odd numbered tracks between Km 288+750 and 288+950, interrupted after the collapse of the retaining wall under the slope, as a consequence of the landslide that occurred on 17/12/2008, and definitive consolidation of railway embankment in the above mentioned segment of the Battipaglia – Reggio Calabria line, between Vibo Pizzo and Mileto stations. Contractor Rete Ferroviaria Italiana SPA. Assignment date of work 18/12/2008, completion date 30/09/2009.
Executing companies A.T.I. Ceprini Costruzioni S.r.l. (c.g.m.) – Fadep S.r.l. (man) – Francesco Ventura Costruzioni S.r.l. (man).
Sharing